54MW Obu Cement Power Plant, Nigeria

PLANT CAPACITY

54 MW

PLANT TYPE

3X SIEMENS SGT500

PLANT MODE

OBU Cement Plant

LOCATION

Edo State, Nigeria

CATEGORY

Existing Project

 

SCOPE OF PROJECT MANAGEMENT

SERVICES SUPPLIED

• Project/Construction Management: Prior to
mobilization of the O&M team,
full Project/Construction Management for
multi-contract “self-build” EPC(M) services consisting
of on-site Project Director and Project Engineer.
• Construction management for all OEM’s,
sub-contractors and sub-suppliers.
• Cost control, quality control, SHE coordination and
reporting to owner

• O&M Services: 6 months prior to commercial
operation date the O&M mobilization to site began
• Mobilization services
• Operation,
• Routine and daily maintenance
• Coordination of planned maintenance by
OEM Siemens
• Unplanned maintenance
• Extra work
• Operational consumables

COVERED EQUIPMENT:

• Gas Turbines and SIEMENS supplied package scope
of supply:
• 3 x SGT-500 Gas Turbines, Generators and
Gas Turbine Packages (turbine and generator
enclosures, ventilation fans, exhaust and filter house)
• Auxiliary systems: (Turbine & Generator Lube Oil
Systems, Fuel System, Vibration Monitoring,
Hydraulic Start System, Fire Fighting System)

• Motor Control Centers (MCC’s)
• Automatic Voltage Regulator System (AVR)
• Gen Protection Relay System
• Synchronization Panels
• Circuit Breakers (Generator)
• Transformers (HV Step-Up and LV Auxiliary)
• Other BOP equipment
• Water Treatment Plant
• DCS
• Plant Fire Fighting System
• Air compressor
• Fuel System (Gas)
• Other related equipment

TOTAL ENERGY DISPATCHED : XXX MWh