Projects

  • Project Date: 2.3.2020
  • Location: Abia State, Nigeria
  • Existing Project

ABA 141 MW 3 X GE LM6000 PD Power Plant

PLANT CAPACITY

141MW nominal

PLANT MODE

Simple Cycle Base load

PLANT TYPE

3 x GE LM6000PD

FUEL TYPE

Natural gas

LOCATION

Abia State, Nigeria

CATEGORY

Existing

COD

March 2020

O&M DURATION

10 years

EPCM DURATION

6 months

 

ABA Scope of Services

EPC + O&M

- Project Management Services

  • Overall project management  prior to mobilization of O&M team
  • Engineering of missing scope of supply
  • Procurement for all sub-contractors/vendors

 

- Commissioning of Gas Turbines, Start-up, performance tests and reliability run

  • KSE with its partner GE(General Electric) will perform cold and hot commissioning , start-up, performance testing and reliability runs.
  • KSE to supply GE with support field service personnel
  • KSE to perform troubleshooting/damage analysis

 

- Commissioning of Balance of Plant

  • Repair all electrical systems in preparation for re-commissioning
  • KSE will perform all electrical testing and performance checks on  BOP
  • KSE will commission the BOP

 

- O&M

  • KSE will be responsible for full operations and maintenance (O&M) including Installation of the 4th Gas Turbine scheduled for phase 2 (O&M phase) of the project