20 Year
Of Experience On Aero Gas Turbines
98%
98% Cumulative Plant Availability
Up To 300 MW
Creative Fuel Solutions Up To 300 MW
Highest Level Expertise
Domain Expertise On GE LM Series
Our Projects
SCOPE OF PROJECT MANAGEMENT Installation and Commissioning of the below covered units 3 x GTG Sets a) LM2500 G4 DLE gas turbines b) Generator c) Gas Turbine package: i) Turbine
SCOPE OF PROJECT MANAGEMENT SERVICES SUPPLIED • Construction Management: Oversee the execution of the overall project and to facilitate that the Gas Turbines are installed and commissioned on time •
SCOPE OF PROJECT MANAGEMENT – SERVICES SUPPLIED • Project/Construction Management: Prior to mobilization of the O&M team, full Project/Construction Management for multi-contract “self-build” EPC(M) services consisting of on-site Project Director
ABOUT THE PROJECT Plant has been commissioned with KSE “In-House” experts. All performance & reliability acceptance tests have been carried out with GE, IEG and KSE. • Plant on 24
Routine Operation & Maintenance Planned Maintenance of Engines and auxiliary equipment Unplanned Maintenance
ABA Scope of Services EPC + O&M – Project Management Services Overall project management prior to mobilization of O&M team Engineering of missing scope of supply Procurement for all sub-contractors/vendors
Asset Manager Asset management agreement on all plant, buildings and other assets Project Management Oversee the execution of the Project Manager to facilitate that the 1 x GE Gas Turbine
News from KSE
KS Energy CEO Steve Martin talks about energy deficit and renewables in Sub-Saharan Africa
KS Energy CEO Steve Martin joined young minds at University of North Dakota on Distributed Solar+LNG/LPG: Sustainable Solution for Africa.
Electricity challenge in SADC is impacting the reliability of several industries and there is definitely an urgent need for a clean, reliable and competitive power solution to support various of
KSE team successfully completed service bulletin 310 implementation for the Orapa 90MW LM6000PC duel fuel power plant in Botswana on the 7th September 2022. Checklist; HPC Top-case removal and
Ongoing cold commissioning of the 141MW Geometric Power Plant; LM6000PD Tear Down Inspection and bearings exchanged completed 2019 at GE shop in Houston GT installation inside package completed 2022 Ongoing
Hot commissioning activities ongoing; (Start date: January, 2024) – CWP 020 Pre-Star; and Crank Testing LM6000 / CM-CWP 020 – CWP 030 Rotation Tests and First Fire LM6000 / CM-CWP
The signing ceremony has been held on January 10, 2024, at Western District A, Western Urban Region where the Memorandum of Understanding for establishing relations to build Natural Gas infrastructure
We are thrilled to share our collaborative alliance with Senkron Energy Digital to help us pursue our mission on delivering reliable energy solutions across Sub-Saharan Africa. By combining our strengths;